Emerson Alternative High

The entire exterior was remodeled to improve the teaching environment for the students and the teachers.  Windows were opened and returned to their original prominence of the building. The rusted exterior stairs were carefully removed from the exterior and a new exit stair was built on the inside of the building.  New HVAC, IT and electrical systems improved overall energy and operational efficiency. The building has been returned as much as possible back to its original beauty.

Type: Architecture
Interior Design
Landscape Architecture
Planning

Sector: K-12 Education